EEHW Testing support(ICE) Service Trigger for Returned parts root cause analysis; Failed parts testing on vehicle; Testing car retrofit needed; Testing data analysis needed Due to the different situations, the time requirement is also dynamic, generally 2 working days for Sensor testing, 4 working days for control unit testing, 5 working days for retrofit. 80 Support Engineer root cause analysis, countermeasure definition, implementation, validation electron component management (e.g. sensor/actuator), focus on localization, failure analysis and validation 80 Create necessary documentation for project ordering powertrain and vehicle testing 80 Familiar with powertrain and vehicle testing tool e.g. INCA, CANoe; Qualification 80 Retrofit completed on time 80 Testing equipment repair and maintenance on high quality 80 Testing data analysis report 100% accuracy 80 Test hardware and software configuration 100% accuracy 80 Weekly work summary submitted on time, show clearly the completed tasks. 80 Software license like INCA/CANoe 80 Testing Vehicle 80 F2 driving license 80 Testing tools 80 Some System access like EPDM/E-Logistic/A2MIC Delivery Deliverable Deliver the result on Demand 1. Equipment and tool storage and record 2. Testing equipment repair and maintenance report 3. testing vehicle retrofit in workshop report 4. Testing data analysis report 5. Test hardware and software configuration 6. Weekly work summary