1. Response for the full technical support on new projects according to the new project Ramp-up Procedure:
负责指定的汽车项目新项目的产品开发:
a. According to the original technical requirements, to work out a plan for new project and take actions; Or according to the initial BOM given by the project feasibility report, carry out the lab investigation (through internal and/or outside lab) in order to optimize the BOM to be process adaptable and properties compliant with the customer requirements.
b. Arrange the engineering sample production, follow up the actual sample production and followed tests, ensure the sample meet the requirement of designation.
根据项目计划筹划安排样品的制造,跟进样品的生产和后期测试,确保样品各项指标达到设计目标;
c. Make sure sample delivered to customer on time, follow up the trial molding on customer site, provide possible and necessary support during the trial molding; Understand the issues happened during the trial molding and later tests; Set up action plan with customer in order to improve and fix the issues.
d. Make improved sample material according to the trial molding status and the improvement action plan. Follow up the trial molding as stated in item c. Follow c and d till the engineering sample was validated by customer.
e. Follow the product production and its usage status during the pilot run stages (pp1 to pp5); Make necessary adjustment on the process and/or BOM to better adapt to the design and customer’s requirements.
跟进试产阶段(Pilot run stages:pp1 to pp5)配方的生产及其在客户的使用状况; 对于一些不适用的情况,在需要调整配方或工艺时及时做出调整,以便达到客户要求。
f. React on customer’s technical requirements change on time; Make risk analysis and formula/process adjustment accordingly in order to meet customer’s requirements.